top of page

Box Park, Croydon

The project involved the fabrication and installation of 171 tonnes of hot rolled steelwork to create a pop-up shipping container mall housing a mix of fashion and lifestyle brands, galleries, cafes and restaurants.

Our contract also involved the off loading and installation of 97 No. modified shipping containers which form part of the retail outlets.

We also had to design and fabricate a container lifting frame specifically for the project.

The mall opened October 2016.

Client:  Box Park Ltd.
Main Contractor:  Randall Contracting Ltd.
 
Engineer:  BDP
 
Architect:  BDP
 
Steel Tonnage:  171 tonnes

STRUCTURES LTD

bottom of page